• Technical Services
 
Technical Services
 
Item Customer Information Work Scope Work Description Location Completion Date Contract Type
1 PETRONAS Gas Bhd Shah Alam Regional Centre Failure mode engineering studies
Engineering studies concerning the root cause for the failure of 42 ins. flange on 42 ins. pipeline causing natural gas leakage for PGB Shah Alam Regional Centre
PGB Shah Alam Regional Centre June 2000 Lump Sum
2 PETRONAS Gas Bhd Kuantan Regional Centre Failure mode engineering studies

Engineering studies concerning the root cause for the failure of 8 ins. flange on 8 ins. pipeline causing natural gas leakage for PGB Kuantan Regional Centre.

PGB Shah Alam Regional Centre September 2000 Lump Sum
3

PETRONAS Gas Bhd

CLIENT : OGP Technical Services Sdn Bhd

Conceptual engineering study Conceptual engineering studies for the proposed expansion of CUF Gebeng for the supply of HHP/HP steam and additional power supplies to BPC Complex in Gebeng, Kuantan. (Project Duration : 8 weeks) PGB CUF Gebeng February 2002

Lump Sum

4

PETRONAS Gas Bhd

CLIENT : Alstom Industries Sdn Bhd

Statutory approval package Engineering and manpower services to develop, plan, issue and implement statutory approval package for the additional installation of Steam Turbine Generator Package (STG) for CUF Kerteh Project. (Project Duration : 6 months) PGB CUF Kerteh June 2002 Lump Sum
 