Engineering studies concerning the root cause for the failure of 42 ins. flange on 42 ins. pipeline causing natural gas leakage for PGB Shah Alam Regional Centre
PGB Shah Alam Regional Centre
June 2000
Lump Sum
2
PETRONAS Gas Bhd Kuantan Regional Centre
Failure mode engineering studies
Engineering studies concerning the root cause for the failure of 8 ins. flange on 8 ins. pipeline causing natural gas leakage for PGB Kuantan Regional Centre.
PGB Shah Alam Regional Centre
September 2000
Lump Sum
3
PETRONAS Gas Bhd
CLIENT : OGP Technical Services Sdn Bhd
Conceptual engineering study
Conceptual engineering studies for the proposed expansion of CUF Gebeng for the supply of HHP/HP steam and additional power supplies to BPC Complex in Gebeng, Kuantan. (Project Duration : 8 weeks)
PGB CUF Gebeng
February 2002
Lump Sum
4
PETRONAS Gas Bhd
CLIENT : Alstom Industries Sdn Bhd
Statutory approval package
Engineering and manpower services to develop, plan, issue and implement statutory approval package for the additional installation of Steam Turbine Generator Package (STG) for CUF Kerteh Project. (Project Duration : 6 months)