| Item |
Customer Information |
Work Scope |
Work Description |
Location |
Completion Date |
Contract Type |
| 41 |
| PORJECT OWNER |
| PETRONAS
Vinyl Chloride |
|
|
Maintenance Services |
To
fabricate t-spool |
Kerteh |
October
2007 |
Lump Sum |
| 42 |
| PORJECT OWNER |
| PETRONAS
Vinyl Chloride |
|
|
Maintenance Services |
Install
facility to inject inhibitor |
Kerteh |
October
2007 |
Lump Sum |
| 43 |
| PORJECT OWNER |
| PETRONAS
Vinyl Chloride |
|
|
Maintenance Services |
Piping
for CW chemical make up |
Kerteh |
October
2007 |
Lump Sum |
| 44 |
| PORJECT OWNER |
| PETRONAS
Vinyl Chloride |
|
|
Maintenance Services |
To
fabricate sampling line and install |
Kerteh |
November
2007 |
Lump Sum |
| 45 |
| PROJECT OWNER |
| PETRONAS
Gas Bhd |
|
|
Maintenance Services |
The
Engineering for the Upgrading of the Loading Arms
at Export Terminal, PGB, Kemaman, Terengganu |
Kemaman |
April
2009 |
Lump Sum |
| 46 |
| PROJECT OWNER: |
| MTBE
Malaysia |
|
|
Maintenance Services |
Supply,
install and testing of piping and its auxiliaries
for Mercury treater facility at area 200 |
Gebeng |
October
2009 |
Lump Sum |
| 47 |
| PROJECT OWNER |
| PETRONAS
Fertilizer Kedah |
|
|
Maintenance Services |
Pre
fabrication and installation of PFKSB's urea
blowdown piping |
Kedah |
August
2009 |
Lump Sum |
| 48 |
| PROJECT OWNER: |
| Makhostia
Sdn Bhd |
|
|
Maintenance Services |
MSB
PJ2 - Cleaning and
Servicing Work for
Auxilliary Gas Boiler for
DOSH Inspection |
Putrajaya |
April
2010 |
Lump Sum |
| |
|
|
|
|
|
|